Quick March Update

Hi, we've just got to tell you that we have, at long last, installed our first run of plastic sleepered track down at the Lake. All went well and we are very pleased, so we look forward to testing it and seeing how it beds in, but so far so good !

So we make.....
                                            



First plastic sleepered panels ready to lay

..then on site at Lakeside, we install !!





 

The new section of plastic sleepered track down to the Lake newly ballasted on 16th March 2019
Meanwhile over at Laurel Sidings ......the old track sections from the Lake are being used in our new, extended carriage siding leanto .....








...and in the station area, rotting point motor sleepers are being  replaced (in plastic of course!)