Sunday, 30 December 2007

Stage Three



We have started work on our third stage which will create a further run of some 230 metres from a triangular junction off 'Stage One' down to Eastgate Halt, where there will be a through platform and bay, together with an engineer's siding where materials for the railway can be delivered from the adjacent Stone Lane. The route will then return via a loop around the 'Lake' and over a flat crossing back onto our existing trackwork into Ashmanhaugh Station. We hope that this section will be operational in time for our August Open Day... 2008 that is!